Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the bt-cost-calculator domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the bt_plugin domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Phillipe Jabre - FREE energy

Phillipe Jabre

Design & implementation of a hybrid solar solution to reduce energy consumption cost
System Type
Hybrid PV Project
Location
Bois de Bologne-Lebanon
Status
Completed
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.23-1.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.40-2.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.25.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.26.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.27.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.31.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.34.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.36.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.38.jpeg
https://freeenergy.co/wp-content/uploads/2020/03/WhatsApp-Image-2020-01-23-at-12.08.42.jpeg

Phillipe Jabre

Title:

Description:


Warning: Trying to access array offset on value of type bool in /var/www/wp-content/themes/industrial/single-portfolio.php on line 279

Phillipe Jabre

Design & implementation of a hybrid solar solution to reduce energy consumption cost
System Type
Hybrid PV Project
Location
Bois de Bologne-Lebanon
Status
Completed
WhatsApp Image 2020-01-23 at 12.08.23
WhatsApp Image 2020-01-23 at 12.08.40

Burdened by the frequent outage of the utility grid and constant reliance on diesel generators to supply his energy demand, Mr. Philippe Jabre has commissioned FREE energy to design and implement the optimal solar solution for his residence in Bologne, Mount Lebanon.

The solar solution proposed was an on-grid PV system coupled with an energy management system, capable of operating with the utility grid to reduce bills via the net metering scheme and synchronizing with the microgrid generated by the diesel generator to reduce the diesel consumption.

 

Year
2018
Yearly Production
98.81 MWh/year
Yearly Savings
14,821.5 USD/Year
CO2 Saved
70.8 tonnes/year
types
solar