Nesma PMV

Located in the Kingdom of Saudi Arabia, the NESMA PMV facility undertook a major renewable energy initiative in partnership with FREE energy to reduce its dependence on diesel generators and cut operational energy costs. The project involved the design and installation of a large-scale on-grid photovoltaic system, fully integrated into the facility’s existing electrical infrastructure to provide a consistent and reliable supply of clean energy.
The system, with a total installed capacity of 1.65 MWp, was implemented without battery storage, focusing instead on maximizing direct generation to offset the facility’s electricity consumption during peak demand hours. This approach not only optimizes cost savings but also minimizes maintenance requirements.
In addition to the PV installation, complementary electrical works were carried out to ensure safe interconnection and compliance with applicable grid standards. The project directly supports NESMA PMV’s sustainability objectives while contributing to national renewable energy targets. By lowering fuel usage and greenhouse gas emissions, it also improves the facility’s environmental performance and operational efficiency.
Key Figures
- System type: On-grid
- Total installed capacity: 1,649.64 kWp
- Yearly energy production: 2,682,508 kWh/year
- CO₂ savings: ~7,258 tonnes/year
Battery storage: None