Committed to professional development and growth and recognizing the need to optimize its internal processes and identify human resources gaps, FREE energy benefited from the support of the Lebanon Enterprise Development (LED) Project.
bt-cost-calculator
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114bt_plugin
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114wordpress-seo
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Committed to professional development and growth and recognizing the need to optimize its internal processes and identify human resources gaps, FREE energy benefited from the support of the Lebanon Enterprise Development (LED) Project.
FREE conducted a level III energy audit complying with ISO 50001 with the main scope of the audit being Zamil Shipyards’ new shipyard facility in Dammam.
An energy audit is an analysis of a facility, indicating how and where that facility can reduce energy consumption and save energy costs. Its insight into energy efficiency and conservation can lead to significant savings on the company’s utility bill.